Desks, servers, files and fit-out moved between offices or cities, scheduled around your trading hours.
Office relocation is the commercial version of a house move: desks, chairs, servers, files and fit-out moved from one workplace to another with the business disruption planned, minimised and priced in. Most office moves happen outside trading hours for exactly that reason.
An office move fails in predictable ways — IT that does not come back online, boxes of files with no labels, and furniture that arrives before the new space is ready. We plan the move as a project: inventory by department, labelled crates by destination, and a schedule agreed with your facilities or office manager before anything moves.
A business cannot stop trading while it moves, so the office relocation is really a scheduling exercise. The move itself might take a weekend; the planning takes weeks. We start with a site survey of both premises — power points, lift sizes, dock access, parking — because those details decide the crew and the equipment.
Everything is labelled by destination before it is loaded. Crates are tagged by department and room, so on the other side the IT team finds its own server racks without opening forty identical boxes.
Office moves range from a single server room to a full-floor fit-out. Retail stock, warehouse racking, medical equipment and school moves all follow the same principle: inventory first, labels second, move third.
If your move overlaps a fit-out, storage is often needed for weeks rather than days. Tell us the window and we will price storage into the project quote rather than discovering it mid-move.
Local and interstate household moves, planned properly.
Read MoreWhole-household moves between states, with storage.
Read More20ft and 40ft containers placed by side loader.
Read MoreBuggies and carts moved on trailers or covered carriers.
Read MoreFloats and horses moved by experienced stock handlers.
Read MoreWinched, craned or trailer-loaded vehicles that cannot drive.
Read MoreYes — after-hours and weekend moves are standard for offices precisely because the business keeps trading. We schedule around your hours and confirm the window in writing.
We handle the physical move — packing, labelling, transport and placement — with care for rack equipment. Your IT team should supervise connections and commissioning; we coordinate the timing with them.
Planning. Inventory by department, labelled crates, a schedule agreed before move day, and a crew sized to finish inside the window. The site survey exists to make sure nothing surprises us on the night.
Transit cover is arranged for the load and set out on the project quote. High-value IT and specialist equipment can be declared for appropriate cover — tell us the values at quote stage.
Yes. Storage during renovations or between leases is common, and it is priced into the project quote so there are no mid-move surprises.
Yes. Interstate office moves are planned as projects with longer lead times — freight schedules, storage gaps and staff relocation all factor into the plan and the price.
An office move is a project, not a truck. We survey both sites, label everything by destination and schedule the work around your trading hours.
Send the two addresses and a rough scope — we will price the survey, the crew and the schedule as one fixed project.